logo_pge-baltica_rgb.png

PGE Baltica was established in January 2019 as the company responsible for implementing the Offshore Program in the PGE Capital Group which coordinates preparations for the construction of three wind farms:

  • Baltica-1 Wind Farm (EWB1), with a maximum capacity of up to 900 MW;
  • Baltica-2 Wind Farm (EWB2), which in January 2019 received a proposal from PSE for technical conditions for connection to the National Power Grid for a maximum of 1 498 MW;
  • Baltica-3 Wind Farm (EWB3) with a connection agreement with National Power Grid for a maximum of 1 045 MW.

PGE Polska Grupa Energetyczna is the owner of PGE Baltica and EWB-1-3 special purpose vehicles. All three SPVs have location permits enabling the construction of offshore farms in designated areas of the Baltic Sea.

PGE Baltica plans to build three offshore wind farms in the Polish part of the Baltic Sea (Baltica 3 and 2 by 2030, Baltica 1 – after 2030). Their total maximum capacity will be up to 3.5 GW.

gkpge_baltica_site