IGCC

Integrated Gasification Combined Cycle.

Installed capacity

the formal value of active power recorded in the design documentation of a generating system as being the maximum achievable capacity of that system, confirmed by the acceptance protocols of that system (a historical value, it does not change over time.

IRiESP

the Transmission Network Operation and Maintenance Manual required to be prepared by a transmission system operator pursuant to the Energy Law; instructions prepared for power networks that specify in detail the terms and conditions of using these networks by system users as well as terms and conditions for traffic handling, operation and planning the development of these networks; sections on transmission system balancing and system limitation management, including information on comments received from system users and their consideration, are submitted to the ERO President for approval by way of a decision.